sort by date sort by cost
Total 3 entries found , Cost: 33.0 million FCFA
Apr 26, 2021 C_NGAOUI SIGNE 8.0 million FCFA 04/LC/C-NGAOUI/SG/CIPM/2021
Construction d`un CPC à ALHAMDOU (lot 1)
Apr 26, 2021 C_NGAOUI SIGNE 17.0 million FCFA 05/LC/DM/C-NGAOUI/CIPM/SG/2021
Construction d`un logement d`astreinte à Garga Pella (lot 2)
Apr 16, 2020 C_NGAOUI RECEPTIONNE 8.0 million FCFA 08/LC/C-NG/CIPM/MBERE/2020
CPC de BAFOUCK : Construction d’une salle de classe

Top Authorities
Top Dates