sort by date sort by cost
Total 2 entries found , Cost: 50.0 million FCFA
Aug 06, 2019 C_NDU SIGNE 38.0 million FCFA 003/JO/MINDEVEL/NWR/DMDTB/NC/2019
Rehabilitation of water scheme at Mbiyeh
Prestataire: AXE VENTURE ENGINEERING LTD MULTIPLE
Aug 06, 2019 C_NDU SIGNE 12.0 million FCFA 004/JO/MINDEVEL/NWR/DMDTB/NC/2019
Solar street lighting at Ndu
Prestataire: AXE VENTURE ENGINEERING LTD MULTIPLE

Top Authorities
Top Dates