sort by date sort by cost
Total 6 entries found , Cost: 162.0 million FCFA
Apr 25, 2022 C_NDU RECEPTIONNE 23.0 million FCFA 010/JO/NWR/DMD/NC/NCITB/2022
Construction of a bridge over river Nsangri, between Talla and G.S Tengteng on Talla - Ndu farm to market road
Apr 25, 2022 C_NDU RECEPTIONNE 22.0 million FCFA 011/JO/NWR/DMD/NC/NCITB/2022
Construction of the Bridge JMBC-MBOKFU
Apr 25, 2022 C_NDU RECEPTIONNE 40.0 million FCFA 03/JO/NWR/DMD/NC/NCITB/2022
Rehabilitation of the Ndu Public Library
Apr 25, 2022 C_NDU RECEPTIONNE 27.0 million FCFA 12/JO/NWR/DMD/NC/NCITB/2022
The rehabilitation of road from ELECAM junction through Jirt To Mbah, and from Jirt To Nsangri
Apr 25, 2022 C_NDU SIGNE 25.0 million FCFA 009/JO/NWR/DMD/NC/NCITB/2022
Installation of a two-phase transformer at Kakar.
Apr 25, 2022 C_NDU SIGNE 25.0 million FCFA 008/JO/NWR/DMD/NC/NCITB/2022
Installation of a two-phase transformer in Sehn.

Top Authorities
Top Dates