sort by date sort by cost
Total 3 entries found , Cost: 52.5 million FCFA
Oct 20, 2020 C_NDELELE SIGNE 17.5 million FCFA n 007/LC/ST/SG/C.NDEL/CIPM/2020
EP de GBAGBALE : Construction d’un bloc de deux salles de classe à l’école Lot 5
Prestataire: ETS BALAD'SON CONSTRUCTION MISSING
Oct 20, 2020 C_NDELELE SIGNE 17.5 million FCFA n 009/LC/ST/SG/C.NDEL/CIPM/2020
E.P de LISSEY: Construction d’un bloc de deux salles de classe Lot 6
Prestataire: ETS BALAD'SON CONSTRUCTION MISSING
Oct 20, 2020 C_NDELELE SIGNE 17.5 million FCFA n 010/LC/ST/SG/C.NDEL/CIPM/2020
E.P de NGAKO: Construction d`un bloc de 02 salles de classe Lot 4
Prestataire: ETS BALAD'SON CONSTRUCTION MISSING

Top Authorities
Top Dates