sort by date sort by cost
Total 3 entries found , Cost: 35.0 million FCFA
Sep 03, 2020 C_MUNDEMBA SIGNE 8.0 million FCFA 09/JO/MCITB/SWRPIB2020
IHC. Meangwe: Equipment with medical equipments
Prestataire: WED-ROMA CAMEROON MISSING
Sep 03, 2020 C_MUNDEMBA SIGNE 8.0 million FCFA 08/JO/MCITB/SWRPIB2020
IHC Mundemba: Equipment with medical equipments
Prestataire: WED-ROMA CAMEROON MISSING
Aug 06, 2020 C_MUNDEMBA SIGNE 19.0 million FCFA 05/JO/M/MCITB/SWRPIB2020
Construction of a cassava processing factory: Manja
Prestataire: WED-ROMA CAMEROON MISSING

Top Authorities
Top Prestataires
Top Dates