sort by date sort by cost
Total 17 entries found , Cost: 305.6 million FCFA
Nov 07, 2022 C_MOUTOURWA SIGNE 17.1 million FCFA 15/LC/C.MTWA/CIPM/2022
Travaux de cantonnage sur le tronçon de route National bitumé...PK 182+500 (37,500 KM)
Prestataire: ETS AJERAM MISSING
Oct 10, 2022 C_MOUTOURWA SIGNE 10.0 million FCFA 10/LC/C.MTWA/CIPM/AI/2022
Travaux de gestion des sites reboisés << opération sahel vert >> (Mordok-Badjova-Yiwa-Missilia)
Prestataire: ETS MASSIVE DYNAMIC MULTIPLE
Sep 07, 2022 C_MOUTOURWA SIGNE 27.0 million FCFA 11/LC/C.MTWA/CIPM/2022
Travaux d`entretien routier
Prestataire: ETS SADJO BABA MULTIPLE
Sep 07, 2022 C_MOUTOURWA SIGNE 25.0 million FCFA 12/LC/C.MTWA/CIPM/2022
Construction d`un bloc administratif au complexe Bongolori
Prestataire: ETS SADJO BABA MULTIPLE
Jul 18, 2022 C_MOUTOURWA SIGNE 19.0 million FCFA 06/LC/C.MTWA/CIPM/2022
Construction d`un bloc de 02 salles de classe EP Moussourtouk
Prestataire: ETS K.M SOLUTION MISSING
Jul 18, 2022 C_MOUTOURWA SIGNE 19.0 million FCFA 05/LC/C.MTWA/CIPM/2022
Construction d`un bloc de 02 salles de classe EP Djinguimi
Prestataire: ETS AT CONSTRUCTIONS MULTIPLE
Jul 11, 2022 C_MOUTOURWA SIGNE 50.0 million FCFA 07/M/C.MTWA/CIPM/2022
Travaux D`électrification En MT Et BT
Jul 04, 2022 C_MOUTOURWA SIGNE 5.0 million FCFA 09/LC/C.MTWA/CIPM/2022
Equipement de la plateforme sportive a Bongolori
Prestataire: ETS LA REFERENCE MULTIPLE
Jul 04, 2022 C_MOUTOURWA SIGNE 9.5 million FCFA 08/LC/C.MTWA/CIPM/2022
Construction d`un bloc de 01 salles de classe EP Sarmoizougui
Prestataire: ETS LA REFERENCE MULTIPLE
Jun 24, 2022 C_MOUTOURWA SIGNE 35.0 million FCFA 03/LC/C.MTWA/CIPM/2022
Finition des travaux du CSI de Mogong
Prestataire: ETS AJERAM MISSING
Jun 24, 2022 C_MOUTOURWA SIGNE 30.0 million FCFA 01/LC/C.MTWA/CIPM/2022
Construction du marché a bétail de Moutourwa
Prestataire: ETS AJERAM MISSING
Jun 23, 2022 C_MOUTOURWA SIGNE 19.0 million FCFA 02/LC/C.MTWA/CIPM/2022
Construction d`un bloc de 02 salles de classe à EP Ganaha
Prestataire: ETS SYNAPSE ENTREPRISE MISSING
Jun 22, 2022 C_MOUTOURWA SIGNE 8.0 million FCFA 04 bis/LC/C.MTWA/CIPM/2022
Construction d`un forage de PMH à Mordok Sinkoa
Jun 22, 2022 C_MOUTOURWA SIGNE 8.0 million FCFA 04bis3/LC/C.MTWA/CIPM/2022
Construction d`un forage à PMH Damaidin Layaw
Jun 22, 2022 C_MOUTOURWA SIGNE 8.0 million FCFA 04bis1/LC/C.MTWA/CIPM/2022
Construction d`un forage à PMH Moutourwa
Jun 22, 2022 C_MOUTOURWA SIGNE 8.0 million FCFA 04/LC/C.MTWA/CIPM/2022
Construction d`un forage à PMH Ilir (Bouloumoud)
Jun 22, 2022 C_MOUTOURWA SIGNE 8.0 million FCFA 04bis2/LC/C.MTWA/CIPM/AI/2022
Construction d`un forage PMH Zetengring (talla Gudi)

Top Authorities
Top Dates