sort by date sort by cost
Total 6 entries found , Cost: 90.0 million FCFA
Jul 11, 2022 C_MOUTOURWA SIGNE 50.0 million FCFA 07/M/C.MTWA/CIPM/2022
Travaux D`électrification En MT Et BT
Jun 22, 2022 C_MOUTOURWA SIGNE 8.0 million FCFA 04bis3/LC/C.MTWA/CIPM/2022
Construction d`un forage à PMH Damaidin Layaw
Jun 22, 2022 C_MOUTOURWA SIGNE 8.0 million FCFA 04/LC/C.MTWA/CIPM/2022
Construction d`un forage à PMH Ilir (Bouloumoud)
Jun 22, 2022 C_MOUTOURWA SIGNE 8.0 million FCFA 04bis1/LC/C.MTWA/CIPM/2022
Construction d`un forage à PMH Moutourwa
Jun 22, 2022 C_MOUTOURWA SIGNE 8.0 million FCFA 04 bis/LC/C.MTWA/CIPM/2022
Construction d`un forage de PMH à Mordok Sinkoa
Jun 22, 2022 C_MOUTOURWA SIGNE 8.0 million FCFA 04bis2/LC/C.MTWA/CIPM/AI/2022
Construction d`un forage PMH Zetengring (talla Gudi)

Top Authorities
Top Dates