sort by date sort by cost
Total 8 entries found , Cost: 175.6 million FCFA
Apr 10, 2018 C_MOULVOUDAYE RECEPTIONNE 18.9 million FCFA 018/LC/PR/MINMAP/DMK/2018
EP MBOURLOUM MODI : Construction d`un bloc de deux salles de classe
Prestataire: ETS BACHIROU HALILOU MULTIPLE
Apr 02, 2018 C_MOULVOUDAYE RECEPTIONNE 8.0 million FCFA 010/LC/PR/MINMAP/SPM/2018
CSI de DARAM : Equipement en matériel médical
Prestataire: ETS YAKOUB MULTIPLE
Mar 27, 2018 C_MOULVOUDAYE SIGNE 22.1 million FCFA 023/LC/PR/MINMAP/DMK/2018
CONSTRUCTION D UN BLOC DE DEUX SALLES DE CLASSES ET LATRINES A L EP DE PITOA-KOLARA
Prestataire: ETS HANYA
Mar 26, 2018 C_MOULVOUDAYE SIGNE 32.6 million FCFA 025/LC/PR/MINMAP/DREN/DMK/2017
CONSTRUCTION DE 04 FORAGES EQUIPES A L EP DE BADADJI PITOA KOLARA
Prestataire: ETS YANPELDA SAINI INACTIF 11months
Feb 16, 2018 C_MOULVOUDAYE SIGNE 21.6 million FCFA 022/LC/PR/MINMAP/DMK/2018
Réalisation d`un forage équipé de PMH à KADAYE-DJAMBOUTOU (RP)
Prestataire: ETS ABOUDA MULTIPLE
Feb 02, 2018 C_MOULVOUDAYE SIGNE 28.5 million FCFA 003/LC/MINMAP/DREN/CRPM-AI/SMI/CBSA/2018
MISE EN ŒUVRE DES PROJETS A IMPACTS RAPIDES:Construction de 03 forages équipés de PMH dans les localités de LOUGGUE (DARAM), BALAMBALE (KORRE) et OURO DOUADI TCHOFFI (KOLARA),
Prestataire: ETS BRAHIM KALI
Jan 30, 2018 C_MOULVOUDAYE SIGNE 14.0 million FCFA 017/LC/CDPM-MK/2017
Réhabilitation d`un radier à GADJA (RP)
Prestataire: ETS YANONE MULTIPLE
Nov 27, 2017 C_MOULVOUDAYE RECEPTIONNE 30.0 million FCFA 021/LC/AC/PR/DMK/2017
Construction d`une marre artificelle à GOUDOUM-GOUDOUM (RP)
Prestataire: ETS SADJO BABA MULTIPLE

Top Authorities
Top Dates