sort by date sort by cost
Total 5 entries found , Cost: 123.3 million FCFA
Jul 02, 2021 C_MOKOLO RECEPTIONNE 22.0 million FCFA 009/LC/C.MOK/SG/2021
TRAVAUX DE CONSTRUCTION D`UN BLOC DE (02) DEUX SALLES DE CLASSE A L`E.P KILWO
Prestataire: ETS ABDOURAMAN ET FILS MULTIPLE
Jun 16, 2021 C_MOKOLO RECEPTIONNE 22.0 million FCFA 014/LC/C.MOK/SG/2021
Construction d`un bloc de deux salles de classe à EP Kide Lot 2
Prestataire: ETS ABDOURAMAN ET FILS MULTIPLE
May 16, 2019 C_MOKOLO RECEPTIONNE 27.4 million FCFA 010/LC/C-MOK/TBEC/2019
CONSTRUCTION DE DEUX DALOTS SIMPLES DE 1 X 1 AUX LIEUDITS DERRIERE DOMICILE ZRA DOUA ; DOMICILE ANCIEN SOUS-PREFET YATAHAI NGARWA ; CONSTRUCTION CANIVEAUX CHAMP DE PRIERRE ET AMENAGEMENT DU PONT MATAKON LDAMA lot 1
Prestataire: ETS ABDOURAMAN ET FILS MULTIPLE
Apr 25, 2019 C_MOKOLO RECEPTIONNE 21.9 million FCFA 001/LC/C-MOK/TBEC/2019
EP de MOUFOU-SUD : Construction d`un bloc de deux salles de classe
Prestataire: ETS ABDOURAMAN ET FILS MULTIPLE
Apr 18, 2017 C_MOKOLO RECEPTIONNE 30.0 million FCFA 004/LC/C-MOKOLO/CIPM/TBEC/2017
Construction d`un bloc de 2 salles de classes avec bureau du Directeur à la SAR/SM de ZIDIM
Prestataire: ETS ABDOURAMAN ET FILS MULTIPLE

Top Authorities