sort by date sort by cost
Total 2 entries found , Cost: 86.0 million FCFA
Jun 20, 2022 C_MINTA SIGNE 60.0 million FCFA 01/M/MINDDEVEL/RCE/DHS/C MTA/SG/2022
Construction de trois (03) forages en energie solaire dans certaines localité de la commune de Minta
Apr 08, 2022 C_MINTA RECEPTIONNE 26.0 million FCFA 01/LC/C MINTA/CIPM/2022
TRAVAUX DE CONSTRUCTION DE TROIS FORAGES EQUIPES DE PMH DANS LES LOCALITES DE MEBAA,ABOKOUNG ET NYLON

Top Authorities
Top Dates