SURVEILLANCE ET CONTROLE TECHNIQUE DES TRAVAUX DE CONSTRUCTION DE L`AUBERGE MUNICIPALE DE MINTA
Aug 18, 2019
C_MINTA
SIGNE
5.0 million
FCFA
009/LC/RCE/DHS/CMTA/SG/19
FOURNITURE D`UN GROUPE ELECTROGENE DE 7KVA POUR LA SAR/SM DE MINTA
Jul 02, 2019
C_MINTA
SIGNE
29.0 million
FCFA
006/LC/CMTA/SG/19
TRAVAUX DE CONSTRUCTION D`UN BLOC DE 2 SALLES DE CLASSE EQUIPES DE 60 TABLES BANCS DE 2 CHAISES ET 2 TABLES POUR ENSEIGNANTS A L`EP D`ELOT CONSTRUCTION DE 2 BLOCS LATRINE DE 4 COMPARTIMENTS A FOSSES VENTILES A L`EP D`ELOT ET AU HANGAR DU MARCHE DE MINTA
Jun 23, 2019
C_MINTA
SIGNE
8.0 million
FCFA
004/LC/RCE/DHS/CMTA/SG/19
Construction d`un forage à MEWENE
Jun 19, 2019
C_MINTA
SIGNE
99.7 million
FCFA
008/LC/RCE/DHS/CMTA/SG/19
Acquisition et installation d`un groupe électrogene pour l`electrification de la ville de MINTA
May 23, 2019
C_MINTA
SIGNE
24.6 million
FCFA
006/LC/RCE/DHS/CMTA/SG/19
Construction d`un hall de marché à MBET
May 06, 2019
C_MINTA
SIGNE
18.9 million
FCFA
007/LC/RCE/DHS/CMTA/SG/19
Tavaux de construction d`un bloc de deux salles de classe: Lot1 (EP de MEDALBOM)
Apr 22, 2019
C_MINTA
SIGNE
18.9 million
FCFA
003/LC/RCE/DHS/CMTA/SG/19
Tavaux de construction d`un bloc de deux salles de classe: Lot2 (SAR/SMDE MINTA)
Feb 10, 2019
C_MINTA
SIGNE
142.0 million
FCFA
001/M/DRCE/DDHS/SPM/18
TRAVAUX D`ACHEVEMENT DE LA CONSTRUCTION DE L`AUBERGE MUNICIPALE DE LA COMMUNE DE MINTA