sort by date sort by cost
Total 4 entries found , Cost: 69.9 million FCFA
Jun 02, 2020 C_MESSAMENA SIGNE 17.5 million FCFA 006/LC/SG/ST/C.MNA/CIPM/2020
EP de DIMPAM : Construction d’un bloc de 02 salles de classe Lot 5
Prestataire: ETS KUNJOM MISSING
Jun 02, 2020 C_MESSAMENA SIGNE 17.5 million FCFA 007/LC/SG/ST/C.MNA/CIPM/2020
EP LAKABO : Construction d’un bloc de 02 salles de classes Lot 6
Prestataire: ETS KUNJOM MISSING
Apr 24, 2020 C_MESSAMENA RECEPTIONNE 17.4 million FCFA 002/LC/SG/ST/C.MNA/CIPM/2020
EP de MALEULEUN : Construction d’un bloc de 02 salles de classe Lot 3
Prestataire: ETS KUNJOM MISSING
Apr 24, 2020 C_MESSAMENA RECEPTIONNE 17.4 million FCFA 001/LC/SG/ST/C.MNA/CIPM/2020
EP DIOULA Lot 2
Prestataire: ETS KUNJOM MISSING

Top Authorities
Top Prestataires
Top Dates