sort by date sort by cost
Total 4 entries found , Cost: 78.0 million FCFA
Jul 06, 2019 C_MESSAMENA SIGNE 17.8 million FCFA 09/LC/ST/SG/C.MNA/CIPM/2019
Réhabilitation de la piste Agricole ESSIENGBOT - KODJAH (DERNIER HAMEAU) (6 KM)
Prestataire: ETS BETHEL LA GRACE MISSING
Jul 06, 2019 C_MESSAMENA SIGNE 14.9 million FCFA 011/LC/ST/C.MNA/CIPM/2019
Réhabilitation de la piste Agricole NBLAMDJOCK - MBA (9 KM)
Prestataire: ETS BETHEL LA GRACE MISSING
Jul 06, 2019 C_MESSAMENA SIGNE 17.7 million FCFA 010/LC/ST/SG/C.MNA/CIPM/2019
Réhabilitation de la piste Agricole TESSANG – KOUA CARREFOUR (12 KM)
Prestataire: ETS BETHEL LA GRACE MISSING
Jul 06, 2019 C_MESSAMENA SIGNE 27.6 million FCFA 08/LC/ST/SG/C.MNA/CIPM/2019
Réhabilitation de la route communale ESSIENGBOT – NEMEYONG II (24 KM)
Prestataire: ETS BETHEL LA GRACE MISSING

Top Authorities
Top Prestataires
Top Dates