sort by date sort by cost
Total 7 entries found , Cost: 165.6 million FCFA
Apr 30, 2020 C_MESSAMENA RECEPTIONNE 29.9 million FCFA 004/LC/SG/ST/C.MNA/CIPM/20
COMMUNE DE MESSAMENA : Réhabilitation de la piste Agricole: NEMEYONG II – MALEN V (15 KM) Lot 1
Prestataire: ETS BETHEL LA GRACE MISSING
Apr 30, 2020 C_MESSAMENA SIGNE 27.7 million FCFA 005/LC/SG/ST/C.MNA/CIPM/20
ESSIENGBOT – NEMEYONG II (NGOULMINANGA –NEMEYONG II (10 KM) : Réhabilitation des routes communales Lot 1
Prestataire: ETS BETHEL LA GRACE MISSING
Apr 30, 2020 C_MESSAMENA SIGNE 29.9 million FCFA 004/LC/SG/ST/C.MNA/CIPM/20
COMMUNE DE MESSAMENA : Réhabilitation de la piste Agricole: NEMEYONG II – MALEN V (15 KM) Lot 1
Prestataire: ETS BETHEL LA GRACE MISSING
Jul 06, 2019 C_MESSAMENA SIGNE 27.6 million FCFA 08/LC/ST/SG/C.MNA/CIPM/2019
Réhabilitation de la route communale ESSIENGBOT – NEMEYONG II (24 KM)
Prestataire: ETS BETHEL LA GRACE MISSING
Jul 06, 2019 C_MESSAMENA SIGNE 17.8 million FCFA 09/LC/ST/SG/C.MNA/CIPM/2019
Réhabilitation de la piste Agricole ESSIENGBOT - KODJAH (DERNIER HAMEAU) (6 KM)
Prestataire: ETS BETHEL LA GRACE MISSING
Jul 06, 2019 C_MESSAMENA SIGNE 14.9 million FCFA 011/LC/ST/C.MNA/CIPM/2019
Réhabilitation de la piste Agricole NBLAMDJOCK - MBA (9 KM)
Prestataire: ETS BETHEL LA GRACE MISSING
Jul 06, 2019 C_MESSAMENA SIGNE 17.7 million FCFA 010/LC/ST/SG/C.MNA/CIPM/2019
Réhabilitation de la piste Agricole TESSANG – KOUA CARREFOUR (12 KM)
Prestataire: ETS BETHEL LA GRACE MISSING

Top Authorities
Top Prestataires