Aug 10, 2022
C_MEIGANGA
SIGNE
30.0 million
FCFA
19/LC/C-MGA/CIPM/2022
Achevement des travaux de Construction de quatorze(14) boutiques
Jan 31, 2022
C_MEIGANGA
SIGNE
92.9 million
FCFA
09/M/CMGA/CIPM/2022
TRAVAUX DE CONSTRUCTION DE 02 BLOC DE 02 SALLES DE CLASSE EQUIPEES DE 60 TABLES BANC + BLOC ADMINISTRATIF CHACUN DANS LE EP DE LOKOTI GROUPE 2 ET EP HORE KOUNI CONSTRUCTION DE 01 BLOC DE 03 SALLES DE CLASSE EQUIPEES DE 90 TABLES BANCS A EP DAKERE ET CONSTRUCTION D UN BLOC LATRINES ECOLOGIQUES A 03 CABINES DANS LES EP HORE KOUNI ET EP DAKERE