sort by date sort by cost
Total 11 entries found , Cost: 152.0 million FCFA
2023 C_MBONGE ATTRIBUE
FOR THE CONSTRUCTION OF A YOUTH CENTER IN MBONGE MARUMBA
Prestataire: TENAS COMPANY LTD
2023 C_MBONGE ATTRIBUE
Construction of eight lockup stores at Mbonge Marumba
Prestataire: JENA HOLDINGS LTD
2023 C_MBONGE ATTRIBUE
Construction of market sheds with twenty-eight (28) counters
2023 C_MBONGE ATTRIBUE
Rehabilitation of GBPS Mbonge
Prestataire: DYNAMIC ENT. MULTIPLE
2023 C_MBONGE ATTRIBUE
FOR THE CONSTRUCTION OF A BRIDGE AT MBENGE- MBOKA AND MBENGE-MBOKA NEWLAYOUT IN EKOMBE BONJI FARM TO MARKET ROAD
Prestataire: THE A1 GROUP
Jun 22, 2023 C_MBONGE SIGNE 5.4 million FCFA N04/KONYE/MEME/ITB/2023
FOR THE SUPPLY OF WOODEN SCHOOL DESKS AT GBPS MBONGE
Prestataire: MAXEM ENTERPRISE
Jun 20, 2023 C_MBONGE SIGNE 25.9 million FCFA N03/JO/MAYOR MBONGE/MEME/ITB/2023
Construction of a warehouse at the Mbonge breach
Prestataire: THE A1 GROUP
May 03, 2023 C_MBONGE SIGNE 20.6 million FCFA N01/JO/MAYOR MBONGE/MEME/ITB/2023
Construction of market sheds with twenty-eight (28) counters
Prestataire: WONJE SERVICES COMPANY LTD 12months
Apr 27, 2023 C_MBONGE SIGNE 14.6 million FCFA N02/JO/MAYOR/MBONGE/MEME/ITB/2023
Rehabilitation of GBPS Mbonge
Prestataire: DYNAMIC ENT. MULTIPLE
Apr 12, 2023 C_MBONGE SIGNE 53.5 million FCFA N01/C/MAYOR/MBONGE/MEME//ITB/2023
Construction of eight lockup stores at Mbonge Marumba
Prestataire: JENA HOLDINGS LTD INACTIF
Aug 18, 2022 C_MBONGE RECEPTIONNE 32.0 million FCFA N06/JO/MBONGE COUNCIL/MEME/ITB/2022
The construction of the zoo technical center at mbonge marumbe
Prestataire: BATS ENGINEERING MULTIPLE

Top Authorities
Top Dates