sort by date sort by cost
Total 2 entries found , Cost: 55.9 million FCFA
May 05, 2023 C_MBANGA SIGNE 39.9 million FCFA 002/LC/C/MBA/CIGSMP/2023
Réhabilitation de la route communale Carrefour Maracana-Carrefour Ndoh 3-Carrefour Ndoh 2/hangar du marché ( 4 Km)
Prestataire: ETS WAYIT MULTIPLE
May 05, 2023 C_MBANGA SIGNE 15.9 million FCFA 003/LC/C/MBA/CIGSMP/2023
Travaux de réhabilitation de la piste agricole : 2e Carrefour Dschang Kwater – Plantation Bakossi (06 km)
Prestataire: ETS WAYIT MULTIPLE

Top Authorities
Top Prestataires
Top Dates