sort by date sort by cost
Total 8 entries found , Cost: 140.6 million FCFA
Oct 12, 2019 C_MBANDJOCK SIGNE 27.7 million FCFA 010/LC/MINDDEVEL/RCE/DHS/CMBA/CIPM/2019
Rehabilitation de la route Aro`o Mbolo-Ndo chefferie
Prestataire: ETS ETCG MULTIPLE
Aug 27, 2019 C_MBANDJOCK SIGNE 17.0 million FCFA 004/LC/MINDDEVEL/RCE/DHS/CMBA/CIPM/2019
EP de NYASSI : Construction d`un bloc de 02 salles de classe
Prestataire: ETS BEM MULTIPLE
Aug 20, 2019 C_MBANDJOCK SIGNE 7.9 million FCFA 007/LC/MINDDEVEL/RCE/DHS/CMBA/CIPM/2019
Equipement de deux (02) CSI dans la commune de MBANDJOCK: Lot 1 CSI de Nyassi
Prestataire: ETS ND SOLUTIONS MULTIPLE
Aug 13, 2019 C_MBANDJOCK SIGNE 7.3 million FCFA 002/LC/MINDDEVEL/RCE/DHS/CMBA/CIPM/2019
Construction des forages dans certaines localités de la commune de Mbandjock: Lot1 (EP de Mekomba), Lot2 (EP de Nyassi)
Prestataire: AUTOMATEIT ENGINEERING SARL MISSING
Aug 05, 2019 C_MBANDJOCK SIGNE 7.0 million FCFA 005/LC/MINDDEVEL/RCE/DHS/CMBA/CIPM/2019
MBANDJOCK : Elaboration des plans previsionnels locaux de formation
Jul 12, 2019 C_MBANDJOCK SIGNE 48.9 million FCFA 005/LC/MINDDEVEL/RCE/DHS/CMBA/CIPM/19
CSI de NJORE 2: Construction
Prestataire: ETS VILLE NEUVE MULTIPLE
Jul 11, 2019 C_MBANDJOCK SIGNE 9.8 million FCFA 004/LC/RCE/DHS/CMBA/SG
Equipement de deux (02) CSI dans la commune de MBANDJOCK: Lot 2 CSI de NJORE 2
Jul 03, 2019 C_MBANDJOCK SIGNE 15.0 million FCFA 003/LC/RCE/DHS/CMBA/SG/19
CSI de Nyassi: Réhabilitation
Prestataire: ETS BEM MULTIPLE

Top Authorities
Top Dates