sort by date sort by cost
Total 5 entries found , Cost: 94.0 million FCFA
2024 C_MAYO_BALEO ATTRIBUE
Construction du CZV de Mayo Baléo (lot2)
Prestataire: ETS ARABO MULTIPLE
May 15, 2024 C_MAYO_BALEO SIGNE 31.0 million FCFA 07/LC/CMB/CIPM/ST/SG/2024
Construction du CZV de Mayo Baléo (lot2)
Prestataire: ETS ARABO MULTIPLE
May 23, 2023 C_MAYO_BALEO SIGNE 22.0 million FCFA 03/LC/CMB/CIPM/ST/SG/2023
construction d`un bloc de 2 salles de classe à l`EP Guereng-Salmana (LOT 2)
Prestataire: ETS ARABO MULTIPLE
Jun 15, 2022 C_MAYO_BALEO RECEPTIONNE 18.0 million FCFA 11/LC/CMB/CIPM/ST/SG/2022
Construction d’un bloc de deux (02) salles de classe à l’EP Djali
Prestataire: ETS ARABO MULTIPLE
May 18, 2021 C_MAYO_BALEO SIGNE 23.0 million FCFA 08/LC/CMB/CIPM/ST/SG/2021
EM Mayo-Baléo: Construction d`une Clôture (lot 1)
Prestataire: ETS ARABO MULTIPLE

Top Authorities
Top Prestataires