Jun 10, 2022
C_LIMBE_I
SIGNE
7.1 million
FCFA
05/JO/L I C /FAKO/LIMBE I/TB/2022
Construction of a Borehole equipped with electric pump in Bonadikombo (Quarter 16)
Jun 10, 2022
C_LIMBE_I
SIGNE
7.2 million
FCFA
004/JO/L I C/FAKO/LIMBE I /TB/2022
Construction of a Borehole equipped with electric pump in Lower Mawoh