sort by date sort by cost
Total 2 entries found , Cost: 14.3 million FCFA
Jun 10, 2022 C_LIMBE_I SIGNE 7.1 million FCFA 05/JO/L I C /FAKO/LIMBE I/TB/2022
Construction of a Borehole equipped with electric pump in Bonadikombo (Quarter 16)
Jun 10, 2022 C_LIMBE_I SIGNE 7.2 million FCFA 004/JO/L I C/FAKO/LIMBE I /TB/2022
Construction of a Borehole equipped with electric pump in Lower Mawoh

Top Authorities
Top Dates