Total 5 entries found , Cost: 68.0 million FCFA
Apr 21, 2023 C_KUMBO SIGNE 25.0 million FCFA 003/JO/KC/KCITB/PIB-MINDER-2023
Construction of a bridge along Shisong-Ndzenswai farm to market road over Ndzenswai river
Prestataire: ETS ELECTRACK 0months
Apr 21, 2023 C_KUMBO SIGNE 7.5 million FCFA 06/AD/KC/KCITB/PO/2023
For the supply of Equipment to the kumbo Urban (NDzenji) integrated Health Centre
Prestataire: ETS ELECTRACK 0months
Apr 21, 2023 C_KUMBO SIGNE 28.0 million FCFA 002/JO/KC/KCITB/PIB-MINEDUB-2023
Rehabilitation of GPS Tobin in Kumbo Central Sub Division
Prestataire: ETS ELECTRACK 0months
Apr 21, 2023 C_KUMBO SIGNE 7.5 million FCFA 001/JO/KC/KCITB/PIB-MINSANTE 2023
Supply of equipment to Mbah Integrated Health Center
Prestataire: ETS ELECTRACK 0months
2018 C_KUMBO ATTRIBUE
CONSTRUCTION OF THREE MASONRY STONES BRIGES AND 43 REINFORCED CONCRETE RING CULVET IN SOME REHABILITATED ROADS IN KUMBO
Prestataire: ETS ELECTRACK MISSING