sort by date sort by cost
Total 2 entries found , Cost: 34.2 million FCFA
Jun 15, 2022 C_KOUTABA SIGNE 16.8 million FCFA 01/LC/C.KTBA/SG/CIPM/2022
Construction d`un bloc de deux salles de classes à L`EP YOLO BORORO
Prestataire: ETS SABIR MULTIPLE
May 24, 2021 C_KOUTABA SIGNE 17.4 million FCFA 03/LC/C.KTBA/CIPM/2021
EPB de Kouchankap: Construction d’un bloc de deux (02) salles de classe (Lot 2)
Prestataire: ETS SABIR MULTIPLE

Top Authorities
Top Prestataires
Top Dates