sort by date sort by cost
Total 3 entries found , Cost: 132.0 million FCFA
Apr 27, 2021 C_KONTCHA SIGNE 35.0 million FCFA 07/L-C/C.KTCHA/SG/2021
Constrction de la Clôture au CMA de Kontcha (lot 1)
Prestataire: ETS ARABO MULTIPLE
Apr 27, 2021 C_KONTCHA SIGNE 27.0 million FCFA 05/L-C/C.KTCHA/SG/2021
Ouverture de la route Kontcha – Jombi (15 Km)
Prestataire: ETS ARABO MULTIPLE
Jun 23, 2020 C_KONTCHA RECEPTIONNE 70.0 million FCFA 01/M/C.KONTCHA/SG/2020
CMA DE KONTCHA : Construction d`un bloc opératoire
Prestataire: ETS ARABO MULTIPLE

Top Authorities
Top Prestataires
Top Dates