sort by date sort by cost
Total 11 entries found , Cost: 382.4 million FCFA
May 02, 2023 C_KONTCHA SIGNE 25.0 million FCFA 04/LC/C-KTCHA/SG/2023
Ouverture de la piste rurale Kodjoli-Mayo Koutine; Kodjoli-Nadou;Mayo Ngah-Boospan
Prestataire: ETS ARABO MULTIPLE
Apr 27, 2021 C_KONTCHA SIGNE 35.0 million FCFA 07/L-C/C.KTCHA/SG/2021
Constrction de la Clôture au CMA de Kontcha (lot 1)
Prestataire: ETS ARABO MULTIPLE
Apr 27, 2021 C_KONTCHA SIGNE 27.0 million FCFA 05/L-C/C.KTCHA/SG/2021
Ouverture de la route Kontcha – Jombi (15 Km)
Prestataire: ETS ARABO MULTIPLE
Jun 23, 2020 C_KONTCHA RECEPTIONNE 70.0 million FCFA 01/M/C.KONTCHA/SG/2020
CMA DE KONTCHA : Construction d`un bloc opératoire
Prestataire: ETS ARABO MULTIPLE
Aug 10, 2020 C_KONTCHA RECEPTIONNE 20.0 million FCFA 05/LC/C.KTCHA/SG/2020
EM Kontcha centre : construction des infrastructures (clôture, aire de jeu et bloc latrine)
Prestataire: ETS ARABO MULTIPLE
Jun 23, 2020 C_KONTCHA SIGNE 70.0 million FCFA 01/M/C.KONTCHA/SG/2020
CMA DE KONTCHA : Construction d`un bloc opératoire
Prestataire: ETS ARABO MULTIPLE
Jun 08, 2020 C_KONTCHA RECEPTIONNE 27.7 million FCFA 04/LC/C.KTCHA/SG/2020
Ouverture de la route Kontcha – Mafou : 18 Km
Prestataire: ETS ARABO MULTIPLE
Jun 24, 2019 C_KONTCHA SIGNE 34.9 million FCFA 04/LC/CKTCHA/CIPM/SG/2019
CSI de BOUDEL : Construction des logements d`astreinte des médecins
Prestataire: ETS ARABO MULTIPLE
Mar 26, 2019 C_KONTCHA SIGNE 27.7 million FCFA 02/LC/CKTCHA/CIPM/SG/2019
TONGO SARYAYI-DODEO: Ouverture du tronçon de route
Prestataire: ETS ARABO MULTIPLE
Apr 05, 2018 C_KONTCHA RECEPTIONNE 27.0 million FCFA 03/LC/C-KONTCHA/CIPM C-KONTCHA/2018
Entretien routier
Prestataire: ETS ARABO MULTIPLE
Apr 04, 2017 C_KONTCHA RECEPTIONNE 18.0 million FCFA 001/LC/R-AD/D-F&D/CIPM/CK
Construction d`un bloc de deux salles de classe à l`EP de Kontcha
Prestataire: ETS ARABO MULTIPLE

Top Authorities
Top Prestataires