sort by date sort by cost
Total 3 entries found , Cost: 127.0 million FCFA
May 27, 2022 C_KOMBO_ITINDI RECEPTIONNE 27.0 million FCFA 008/JO/KIITB/PIB2022
CONSTRUCTION OF A CONCRETE SUSPENDED FOOTPATH AT BARRACKS
Prestataire: ALPHA ENGINEERING MULTIPLE
May 27, 2022 C_KOMBO_ITINDI RECEPTIONNE 50.0 million FCFA 03/JO/KIITB/PIB2022
Construction of intergrated health center at BARRACKS
Prestataire: ALPHA ENGINEERING MULTIPLE
Apr 27, 2021 C_KOMBO_ITINDI SIGNE 50.0 million FCFA 05/C0/KICITB/2021
Acquisition of solar street lighting at Barracks
Prestataire: ALPHA ENGINEERING MULTIPLE

Top Authorities
Top Prestataires
Top Dates