Renovation of AKWA I community hall
Acquisition of two (02)75HP engine and a flying boat
Rehabilitation of four (04) classrooms GS Nwanyo
Construction of Teachers residence at GPS Mbenmong
Acquisition of three (03) fishing boats with three (03) 15HP engines and nets at Akwa
Construction of roads using concrete at Akwa
Rehabilitation of CMA Akwa
Rehabilitation of thr women empowerment center Akwa
Construction of a generator powered borehole tank and stand at tapsGTC Akwa with and extension to GTTC Akwa