sort by date sort by cost
Total 2 entries found , Cost: 44.7 million FCFA
May 31, 2021 C_KOMBO_ABEDIMO SIGNE 22.4 million FCFA 05/JO/KACITB/2021
CONSTRUCTION OF A GENERATOR POWERED BOREHOLE TANK AND STANDBY TAPS AT MBONGMONG KOMBO ABEDIMO
Prestataire: VALMAB INACTIF -8months
May 31, 2021 C_KOMBO_ABEDIMO SIGNE 22.4 million FCFA 04/JO/KACITB/2021
CONSTRUCTION OF A GENERATOR POWERED BOREHOLE, TANK AND STAND TAPS IN NWANYO KOMBO ABEDIMO
Prestataire: VALMAB INACTIF -8months

Top Authorities
Top Prestataires
Top Dates