sort by date sort by cost
Total 4 entries found , Cost: 89.5 million FCFA
May 31, 2021 C_KOMBO_ABEDIMO SIGNE 22.4 million FCFA 05/JO/KACITB/2021
CONSTRUCTION OF A GENERATOR POWERED BOREHOLE TANK AND STANDBY TAPS AT MBONGMONG KOMBO ABEDIMO
Prestataire: VALMAB INACTIF -8months
May 31, 2021 C_KOMBO_ABEDIMO SIGNE 22.4 million FCFA 04/JO/KACITB/2021
CONSTRUCTION OF A GENERATOR POWERED BOREHOLE, TANK AND STAND TAPS IN NWANYO KOMBO ABEDIMO
Prestataire: VALMAB INACTIF -8months
Jul 08, 2020 C_KOMBO_ABEDIMO SIGNE 17.0 million FCFA 004/JO/KAITB/PIB2020
Water project Akwa Urban Space : Akwa
Prestataire: VALMAB INACTIF -18months
Sep 25, 2019 C_KOMBO_ABEDIMO SIGNE 27.8 million FCFA 004/JO/M/KAITB/2019
G.R. A Akwa : Construction of Water point
Prestataire: VALMAB INACTIF -28months

Top Authorities
Top Prestataires