sort by date sort by cost
Total 3 entries found , Cost: 76.0 million FCFA
May 10, 2023 C_KAR-HAY RECEPTIONNE 24.0 million FCFA 007/2023/LC/C.KHY/CIPM
Installation de vingt (20) lampadaires dans la ville de doukoula
May 10, 2023 C_KAR-HAY SIGNE 22.0 million FCFA 001/2023/LC/C.KHY/CIPM
EP rey-flaing : construction d’un bloc de deux salles de classe
May 10, 2023 C_KAR-HAY SIGNE 30.0 million FCFA 005/2023/LC/C.KHY/CIPM
Ouverture de la piste agricole : Guissia-Walya-ourlargo-boubaye (13 km)

Top Authorities
Top Dates