sort by date sort by cost
Total 2 entries found , Cost: 16.7 million FCFA
Aug 15, 2021 C_HINA SIGNE 8.3 million FCFA 004/LC/C.HINA/SG/2021
Travaux de Construction d`un Forage Equipé de PMH à BOUDOUMDJEREK (LOT 2).
Prestataire: ETS SAABPOUNE INACTIF
Aug 15, 2021 C_HINA SIGNE 8.3 million FCFA 003/LC/C.HINA/SG/2021
TRAVAUX DE CONSTRUCTION D`UN FORAGE EQUIPE DE PMH à l`E.P DE PANAI (LOT1) ARRONDISSEMENT DE HINA
Prestataire: ETS SAABPOUNE INACTIF

Top Authorities
Top Prestataires
Top Dates