Aug 14, 2019
C_HINA
SIGNE
40.0 million
FCFA
005/M/REN/DMT/C-HINA/2019
CONSTRUCTION DE DES DIX (10) FORAGES PRODUCTIFS EQUIPES DE POMPES A MOTRICITE HUMAINE REPARTI EN DEUX (02) LOT, A l’EP DE BEDE, BAMGUEL DJARENDI, HODANGO BOGNO, LOUGGUERE SO’O GAROUA DJALANG ET MADAMA LOT(01)
Aug 14, 2019
C_HINA
SIGNE
40.0 million
FCFA
05/M/REN/DMT/C-HINA/2019
CONSTRUCTION DE DES DIX (10) FORAGES PRODUCTIFS EQUIPES DE POMPES A MOTRICITE HUMAINE REPARTI EN DEUX (02) LOT, A ZANAROU GAZOUAL, DOMAYO MOULDAR, CARREFOUR MOUSSA MATAKAM, KEFET DJEVRENG ET LDOUA Lot (02)