sort by date sort by cost
Total 3 entries found , Cost: 26.9 million FCFA
Apr 30, 2022 C_FURU-AWA SIGNE 26.9 million FCFA 002/JO/MINDDEVEL/FAC/MAYOR/FACITB/MCH/2022
Construction of a bridge over Jumshru stream Lubo road in Furu-Awa Sub Division
Prestataire: ETS SUCCESS MULTIPLE
2021 C_FURU-AWA ATTRIBUE
Electrification of a locality in Furu-Awa
Prestataire: ETS SUCCESS MULTIPLE
2021 C_FURU-AWA ATTRIBUE
For the supply of wash hand and other materials for the fight against COVID-19 in furu-awa
Prestataire: ETS SUCCESS MULTIPLE

Top Authorities
Top Prestataires
Top Dates