sort by date sort by cost
Total 18 entries found , Cost: 516.2 million FCFA
2022 C_FURU-AWA ATTRIBUE
For the construction of a reinforced concrete bridge over river Nangwa in Furu-Awa sub division
Prestataire: ETS.ATTIASON & SONS MISSING
Apr 30, 2022 C_FURU-AWA SIGNE 22.9 million FCFA 001/JO/MINDDEVEL/FAC/MAYOR/FACITB/MCH/2022
Construction of block of two (02) rooms and an office at GS Nser Furu-Awa Sub Division
Prestataire: GOLDEN TOUCH CO. LTD MULTIPLE
Apr 30, 2022 C_FURU-AWA SIGNE 50.0 million FCFA 004/JO/MINDDEVEL/FAC/MAYOR/FACITB/MCH/2022
Rehabilitation of the Furu-Awa Centre in Furu-Awa Village in Furu-Awa Sub Division
Prestataire: EXECUTIVE DREAM
Apr 30, 2022 C_FURU-AWA SIGNE 44.9 million FCFA 003/JO/MINDDEVEL/FAC/MAYOR/FACITB/MCH/2022
Construction of a water Scheme in Akum Village in Furu-Awa Sub Division.
Apr 30, 2022 C_FURU-AWA SIGNE 26.9 million FCFA 002/JO/MINDDEVEL/FAC/MAYOR/FACITB/MCH/2022
Construction of a bridge over Jumshru stream Lubo road in Furu-Awa Sub Division
Prestataire: ETS SUCCESS MULTIPLE
Apr 30, 2022 C_FURU-AWA SIGNE 55.0 million FCFA 005/JO/MINDDEVEL/FAC/MAYOR/FACITB/MCH/2022
Construction of twenty (28) modern market sheds in Biando I frontier market in Furu-Awa Sub Division
Prestataire: KINGDOM DREAM CO LTD 2months
Mar 18, 2020 C_FURU-AWA RECEPTIONNE 59.1 million FCFA 002/JO/MINDDEVEL/MAYOR/FAC/FACITB/MCH/2020
Opening of an eleven (11) km road (Nangwa - Biando)
Prestataire: EXECUTIVE DREAM
Mar 17, 2020 C_FURU-AWA RECEPTIONNE 39.7 million FCFA 003/JO/MINDDEVEL/MAYOR/FAC/FACITB/MCH/2020
Opening of an seven (07) km road (Furu-Awa - Nangwa)
Prestataire: ETS BACHE LIMITED MULTIPLE
2021 C_FURU-AWA ATTRIBUE
Rehabilitation of one 04 km earth road in Furu-Awa
2021 C_FURU-AWA ATTRIBUE
Construction of a water supply scheme in Furu Awa
Prestataire: ETS BACHE LIMITED MULTIPLE
2021 C_FURU-AWA ATTRIBUE
Opening of road from Furu-Awa to Lebo
Prestataire: ETS BACHE LIMITED MULTIPLE
2021 C_FURU-AWA ATTRIBUE
For the supply of wash hand and other materials for the fight against COVID-19 in furu-awa
Prestataire: ETS SUCCESS MULTIPLE
2021 C_FURU-AWA ATTRIBUE
Electrification of a locality in Furu-Awa
Prestataire: ETS SUCCESS MULTIPLE
2020 C_FURU-AWA ATTRIBUE
Extension of pipe-borne water to some neighborhood in Furu-Awa Town
Mar 18, 2020 C_FURU-AWA SIGNE 99.9 million FCFA 001/JO/MINDDEVEL/MAYOR/FAC/FACITB/MCH/2020
Rehabilitation of Furu-Awa - Lubu (7 km)
Prestataire: ETS BACHE LIMITED MULTIPLE
Mar 18, 2020 C_FURU-AWA SIGNE 59.1 million FCFA 002/JO/MINDDEVEL/MAYOR/FAC/FACITB/MCH/2020
Opening of an eleven (11) km road (Nangwa - Biando)
Prestataire: EXECUTIVE DREAM
Mar 17, 2020 C_FURU-AWA SIGNE 39.7 million FCFA 003/JO/MINDDEVEL/MAYOR/FAC/FACITB/MCH/2020
Opening of an seven (07) km road (Furu-Awa - Nangwa)
Prestataire: ETS BACHE LIMITED MULTIPLE
Mar 02, 2017 C_FURU-AWA RECEPTIONNE 19.0 million FCFA 002/JO/PR/MINMAP/RDNW/DD/DTB/MCH/2017
Construction of a block of two 02) classrooms at GS Lubu
Prestataire: ETS SUCCES MULTIPLE

Top Authorities