sort by date sort by cost
Total 5 entries found , Cost: 144.0 million FCFA
May 10, 2022 C_FOUMBOT SIGNE 25.0 million FCFA 02/LC/R-OU/D-NOUN/C.FBOT/CIPM-TBEC/2022
Construction d`un bloc maternelle à l`E.P de GBETSOUEN - FOSSETTE (Lot 2)
May 10, 2022 C_FOUMBOT SIGNE 17.0 million FCFA 03/LC/R-OU/D-NOUN/C.FBOT/CIPM-TBEC/2022
Construction d`un bloc de deux salles de classe à l`Ecole Publique Bilingue de Foumbot Groupe 1A (Lot 3)
Prestataire: ETS FAHD MULTIPLE
May 10, 2022 C_FOUMBOT SIGNE 25.0 million FCFA 01/LC/R-OU/D-NOUN/C.FBOT/CIPM-TBEC/2022
Construction d`un bloc Maternelle à l`E.P de MBANJOU (Lot 1)
Apr 25, 2022 C_FOUMBOT SIGNE 27.0 million FCFA 05/LC/R-OU/D-NOUN/C/FBOT/CIPM-ROUTE/2022
Travaux d`entretien routier des tronçons des routes communales T1: entrée village MASSETTE (route massangam - E.P MASSETTE - grande mosquée - TEINGNETTE) ROUTE Massangam. T2 Entrée CIMENCAM - NJINGOUM _ FOUTOUGOUEN - MASSETTE
Apr 25, 2022 C_FOUMBOT SIGNE 50.0 million FCFA 04/LC/R-OU/D-NOUN/C.FBOT/CIPM-TBEC/2022
Construction d`une salle de fête à l`Hôtel de ville de Foumbot (phase 1)

Top Authorities
Top Dates