sort by date sort by cost
Total 5 entries found , Cost: 1.2 billion FCFA
Mar 01, 2023 C_FOUMBAN SIGNE 441.0 million FCFA 002/M/CFBAN/CIPM/2022
Construction de la gare routière principale de Foumban (en procédure d`urgence)
2022 C_FOUMBAN ATTRIBUE
Construction de la gare routière principale de Foumban (en procédure d`urgence)
Aug 17, 2021 C_FOUMBAN RECEPTIONNE 353.8 million FCFA 002/LC/CFBAN/CIPM/2021
CONSTRUCTION D`UN BATIMENT PRINCIPAL DE L`ESPACE STRUCTURANT DANS LA COMMUNE DE FOUMBAN (EN PROCEDURE D`URGENCE)
Aug 17, 2021 C_FOUMBAN SIGNE 353.8 million FCFA 002/LC/CFBAN/CIPM/2021
CONSTRUCTION D`UN BATIMENT PRINCIPAL DE L`ESPACE STRUCTURANT DANS LA COMMUNE DE FOUMBAN (EN PROCEDURE D`URGENCE)
Feb 08, 2021 C_FOUMBAN SIGNE 49.2 million FCFA 001/LC/CFBAN/CIPM/2020
Travaux de réfection de l`Hôtel de Ville de Foumban

Top Authorities