sort by date sort by cost
Total 2 entries found , Cost: 272.8 million FCFA
Sep 20, 2017 C_FONGOTONGO SIGNE 175.9 million FCFA 006/LC/C-F-T/CIPM/2017
TRAVAUX DE REHABILITATION DE LA ROUTE INTERCOMMUNALE LEFANG-FONGO TONGO ALOTSA NTSENGLA -LELENG LIMITE MOCBIE-BANGANG 30KM
Prestataire: ETS SOKO ET ROLLING S.T.P MISSING
Sep 05, 2017 C_FONGOTONGO SIGNE 96.9 million FCFA 008./LC/C.F.T./CIPM/BIP/2017
TRAVAUX DE REHABILITATION DE LA ROUTE DU SITE TOURISTIQUE MAMI-WATTER CENTRE DE SANTE INTEGRE D`APOUH-Chefferie EP TSIENDUNG-CHEFFERIE LENSAP CARREFOUR SAH MBAH L 10 KM
Prestataire: ETS SOKO ET ROLLING S.T.P MISSING

Top Authorities
Top Dates