sort by date sort by cost
Total 2 entries found , Cost: 15.0 million FCFA
Jul 11, 2022 C_FIGUIL RECEPTIONNE 8.0 million FCFA 02/LC/RN/D42/C-FGL/SG/ST/CIPM/SIGAMP/2022
Réhabilitation de l`aire d’abattage de KONG-KONG, lot 1
Prestataire: ETS OUSMAN ET FRERES MULTIPLE
Jul 04, 2022 C_FIGUIL RECEPTIONNE 7.0 million FCFA 01/LC/RN/D42/C-FGL/SG/ST/CIPM/SIGAMP/2022
Réhabilitation de l`aire d’abattage de Lam, lot 2
Prestataire: ETS OUSMAN ET FRERES MULTIPLE

Top Authorities
Top Prestataires
Top Dates