sort by date sort by cost
Total 4 entries found , Cost: 79.4 million FCFA
Jul 12, 2021 C_FIGUIL RECEPTIONNE 18.4 million FCFA M22/LC/RN/D42/C/FGL/SG/ST/CIPM/2021
Construction d`une clôture + vidéo surveillance à l`E.M de BATAO, lot 1
Prestataire: ETS AFRIQUE EMERGENCE SAK MISSING
Jun 16, 2021 C_FIGUIL RECEPTIONNE 30.0 million FCFA 15/LC/RN/D42/C-FGL/SG/ST/CIPM/2021
CONSTRUCTION DU CENTRE ZOOTECHNIQUE ET VETERINAIRE A LAM
Prestataire: ETS AFRIQUE EMERGENCE SAK MISSING
Jun 16, 2021 C_FIGUIL RECEPTIONNE 8.0 million FCFA 03/AONO-PU/RN/D42/C-F/SG/STCIPM/2021
Construction d`un forage équipé de PMH à DOUVA, lot 1
Prestataire: ETS AFRIQUE EMERGENCE SAK MISSING
May 16, 2021 C_FIGUIL RECEPTIONNE 23.0 million FCFA 16/LC/RN/D42/C-FGL/SG/ST/CIPM/2021
construction d`un magasin de stockage à figuil
Prestataire: ETS AFRIQUE EMERGENCE SAK MISSING

Top Authorities
Top Dates