sort by date sort by cost
Total 2 entries found , Cost: 35.4 million FCFA
Oct 20, 2022 C_EBOLOWA_I SIGNE 16.5 million FCFA 11/LC/AONO/CIPM/CAE1/2022
Extension du bois communal de MVIENG
Prestataire: ETS BOCKY BOCK
Apr 13, 2022 C_EBOLOWA_I SIGNE 18.9 million FCFA 02/LC/CAE1/SG/CIPM/2022
TRAVAUX DE CONSTRUCTION DE 05 PUITS POSITIFS ÉQUIPES DE PMH DANS LES LOCALITÉS DE ZINGUI (ZAÏRE), KONDA(ANYUZOCK)? MVILA-YEMINSEM (2EME HAMEAU) ET LO`O BIYENG(GRAND LO`O) LOT2
Prestataire: ETS BOCKY BOCK

Top Authorities
Top Prestataires
Top Dates