Sep 14, 2023
C_DOUALA_V
SIGNE
55.0 million
FCFA
06/M/ONO/CAD5/CIPM/23
Construction des dalots (Logbessou, Makepé Missoké et autres)
Sep 14, 2023
C_DOUALA_V
SIGNE
30.5 million
FCFA
013/LC/AONO/CAD5/CIPM/23
TRAVAUX DE CONSTRUCTION D`UN PONCEAU RELIANT MAKEPE 2 ET MAKEPE 3 ET LE LYCEE LOGPOM
Oct 14, 2022
C_DOUALA_V
SIGNE
50.0 million
FCFA
014/LC/AONO/CADè/CIPM/2022
CONSTRUCTION D`UNE BOUCHERIE AU MARCHE DOUBLE BALLES DE
BEPANDA