sort by date sort by cost
Total 8 entries found , Cost: 194.6 million FCFA
2020 C_DOUALA_III INFRUCTUEUX
CMA DE NDOKOTI : Equipement en materiel médical
Prestataire: MISSING
Aug 27, 2020 C_DOUALA_III RECEPTIONNE 23.5 million FCFA 003/LC/CAD3/CIPM/2020
FOURNITURE DU MATERIEL DIDACTIQUE (PAQUET MINIMUM) AUX ECOLES PUBLIQUES DE L`ARRN. DE DOUALA 3è
Aug 27, 2020 C_DOUALA_III SIGNE 67.3 million FCFA 006/LC/CAD3/CIPM/2020
Douala Construction du Centre d’Éducation et d’Action Communautaire (CEAC)
Prestataire: ETS D.S.J INACTIF -5months
Jul 29, 2020 C_DOUALA_III SIGNE 24.1 million FCFA 002/LC/CAD3/CIPM/2020
Réhabilitation de la route communale PK 12-NGO DJOH
Jul 27, 2020 C_DOUALA_III SIGNE 24.8 million FCFA 004/LC/CAD3/CIPM/2020
Aménagement des voiries: Centre administratif sousprefecture-Recette municipal
Prestataire: CERTRAV SARL
Jul 15, 2020 C_DOUALA_III RECEPTIONNE 7.4 million FCFA 005/LC/CAD3/CIPM/2020
CMA DE NDOKOTI : Equipement en materiel médical
Prestataire: ETS THEMAR MULTIPLE
Jun 22, 2020 C_DOUALA_III SIGNE 16.2 million FCFA 001/LC/CAD3/CIPM/2020
ENTRETIEN DU BATIMENT ABRITANT LES SERVICES DE LA MAIRIE DE DLA 3
Prestataire: ALKAN ENVIRONMENT SARL 11months
Aug 05, 2019 C_DOUALA_III RECEPTIONNE 31.3 million FCFA 007/LC/CAD 3/CIPM/2019
Construction d`un ponceau définitif reliant Nyalla -chefferie pk 10
Prestataire: ETS RBA

Top Authorities
Top Dates