sort by date sort by cost
Total 1 entries found , Cost: 51.5 million FCFA
Jan 31, 2022 C_DIR SIGNE 51.5 million FCFA 06/M/C.DIR/CIPM/2022
TRAVAUX DE CONSTRUCTION DE 01 BLOCS DE 02 SALLES DE CLASSE EQUIPEES DE 60 TABLE BANCS AVEC BLOC ADMINISRATIF CONSTRUCTION D UN BLOC DE LATRINES ECOLOGIQUES A 03 CABINES ET REHABILITATION DE 02 BLOCS DE 02 SALLES DE CLASSES EQUIPEES DE 120 TABLE BANCS AL EP DE KOUNDE
Prestataire: YEM ET FILS MULTIPLE

Top Authorities
Top Prestataires
Top Dates