sort by date sort by cost
Total 2 entries found , Cost: 107.5 million FCFA
Jan 31, 2022 C_DIR SIGNE 80.5 million FCFA 009/M/C.DIR/CIPM/2022
TRAVAUX DE CONSTRUCTION DE 02 BLOCS de 02 CLASSE AVEC BLOC ADMINISTRATIF EQUIPES DE 60 TABLE-BANC ET UN BLOC DE LATRINES ECOLOGIQUES A 03 CABINES CHACUN DANS LES EP DE BEYALA ET EP GBINAKO ET LA CONSTRUCTION DE 04 BLOCS LATRINES ECOLOGIQUES A 03 CABINES CHACUN DANS LES EP DE DOUA EP DE GAZAGADE EP DE LAMOU ET EP DE TOMEDO
Prestataire: ETS MASSA MULTIPLE
Jul 25, 2018 C_DIR SIGNE 27.0 million FCFA 030/LC/R-AD/D-MB/DDMP/CDPM/C-DIR/2018
Commune de DIR : Réhabilitation des routes communales
Prestataire: ETS MASSA MULTIPLE

Top Authorities
Top Prestataires
Top Dates