sort by date sort by cost
Total 2 entries found , Cost: 156.1 million FCFA
Jan 31, 2022 C_DIR SIGNE 91.7 million FCFA 007/M/C.DIR/CIPM/2022
TRAVAUX DE CONSTRUCTION DE 03 BLOCS DE 02 SALLES DE CLASSE AVEC BLOC ADMINISTRATIF EQUIPEES DE 60 TABLE BANCS ET UN BLOC LATRINES ECOLOGIQUES A 03 CABINES CHACUN DANS LES EP DE DJEREM KABAWA EP KELA-SAMI ET EP DE WAAH
Prestataire: ETS ALI MULTIPLE
Sep 30, 2021 C_DIR SIGNE 64.4 million FCFA 18/M/C.DIR/CIPM/2021
TRAVAUX DE CONSTRUCTION DE 02 BLOCS DE 02 SALLES DE CLASSE EQUIPEES DE 120 TABLE BANCS AVEC UN BLOC DE 03 LATRINES DANS LES EP DE BOY BAYA ET DE MALINGARA
Prestataire: ETS ALI MULTIPLE

Top Authorities
Top Prestataires
Top Dates