sort by date sort by cost
Total 3 entries found , Cost: 80.3 million FCFA
Jun 07, 2024 C_DATCHEKA SIGNE 80.3 million FCFA 00002/2024/M/K25/SAEF/CDPMMD
Travaux de construction de la perception de Datcheka (phase 3)
Prestataire: ETS GNAGA MULTIPLE
2022 C_DATCHEKA ATTRIBUE
Construction d`un bloc de deux salles de classe à l`EP de TINING Lot 1
Prestataire: ETS GNAGA MULTIPLE
2020 C_DATCHEKA ATTRIBUE
EP Zouaye réhabilitation de six (06) salles de classe
Prestataire: ETS GNAGA MULTIPLE

Top Authorities
Top Prestataires