Rahabilitation of the Women Empowerment Center at Buea Council LOT 2
Construction of an Amusement Park (Phase I)
CONSTRUCTION OF THREE (03) BLOCKS OF TWEENTY SIX (26) SHOPS AND A MODERN TOILET AT THE CENTRAL MARKET IN BUEA LOT 1: CONSTRUCTION OF A BLOCK A WITH TWEENTY SIX (26) SHOP SKELETAL WORKS OF BLOCK B WITH TWEENTY SIX (26) SHOPS LOT 1
Construction of Three Blocks of 26 Closed Shops each and Toilet Facilities at the Buea Council Central Market Phase II
Rehabilitation of CEAC Bokova LOT 1
CONSTRUCTION OF A PERMANENT BRIDGE AT THE ENTRANCE TO MOKI GARAGE QUARTER IN BUEA
Construction of a Poultry Farm for the Buea Council Council LOT 3
CONSTRUCTION OF SOME ELECTRICAL POWERED BOREHOLES WITH OVER-HEAD TANKS WITHIN THE BUEA MUNICIPALITY LOT 1
CONSTRUCTION OF SOME ELECTRICAL POWERED BOREHOLES WITH OVER-HEAD TANKS WITHIN THE BUEA MUNICIPALITY LOT3
CONSTRUCTION OF SOME ELECTRICAL POWERED BOREHOLE WITH OVER-HEAD TANKS WITHIN THE BUEA MUNICIPALITY LOT 2
Jun 20, 2024
C_BUEA
SIGNE
100.0 million
FCFA
005/C/BUEA COUNCIL/BCTB/2024
CONSTRUCTION OF THREE (03) BLOCKS OF TWEENTY SIX (26) SHOPS AND A MODERN TOILET AT THE CENTRAL MARKET IN BUEA LOT 1: CONSTRUCTION OF A BLOCK A WITH TWEENTY SIX (26) SHOP SKELETAL WORKS OF BLOCK B WITH TWEENTY SIX (26) SHOPS LOT 1
Jun 19, 2024
C_BUEA
SIGNE
100.0 million
FCFA
007/C/BUEA COUNCIL/BCTB/2024
Construction of an Amusement Park (Phase I)
Jun 19, 2024
C_BUEA
SIGNE
100.0 million
FCFA
006/C/BUEA COUNCIL/BCTB/2024
Construction of Three Blocks of 26 Closed Shops each and Toilet Facilities at the Buea Council Central Market Phase II
Jun 13, 2024
C_BUEA
SIGNE
20.0 million
FCFA
011/JO/BUEA COUNCIL/BCTB/2024
Construction of a Block of two(02) Classrooms at GS Molyko Town
May 19, 2024
C_BUEA
SIGNE
14.2 million
FCFA
002/JO/BUEA COUNCIL/BCTB/2024
Rehabilitation of CEAC Bokova LOT 1