sort by date sort by cost
Total 2 entries found , Cost: 44.2 million FCFA
Sep 30, 2020 C_BERTOUA_I RECEPTIONNE 24.8 million FCFA 016/LC/CBTA1
Construction d`un ponceau sur la rivière GBELL (Birpondo-Pkwandjang-Bonis
Aug 27, 2020 C_BERTOUA_I RECEPTIONNE 19.4 million FCFA 006/LC/CBTA1/2020
Construction d`une clôture à l`Ecole Publique de MOKOLO SEMBE Gp 3 Lot 9

Top Authorities
Top Dates