Aug 22, 2019 C_BELO SIGNE 50.0 million FCFA 03 /JO /MINDDEVEL /BC /BCITB /2019
Ashing- Sho village: Extension of electricity with a step down 3 phase transformer, phase 1
Prestataire: CONCEPT ENGINEERING MULTIPLE
Aug 22, 2019 C_BELO SIGNE 36.0 million FCFA 01 /JO /MINDDEVEL /BC /BCITB / 2019
GS Njinikejem : Construction of two (02) blocks of 02 classrooms
Prestataire: CONCEPT ENGINEERING MULTIPLE