sort by date sort by cost
Total 3 entries found , Cost: 84.8 million FCFA
Jun 11, 2018 C_BATCHAM SIGNE 30.0 million FCFA 05/LC/CM/BAT/CIPM/2018
Construction d`un ceac a mba`a-bangang
Prestataire: ETS NDEGHUM ENGINEERING 6months
May 14, 2018 C_BATCHAM SIGNE 29.8 million FCFA 04/LC/CM/BAT/CIPM/SG/2018
Construction d`un bloc de 2 salles de classes avec bureau du Directeur à la SAR/SM de BATCHAM
Prestataire: ETS NDEGHUM ENGINEERING 5months
May 14, 2018 C_BATCHAM SIGNE 25.0 million FCFA 01/LC/CM/BAT/CIPM/SG/2018
Construction d`un bloc maternel à l`EM de BADENGANG
Prestataire: ETS NDEGHUM ENGINEERING 5months

Top Authorities
Top Dates