sort by date sort by cost
Total 2 entries found , Cost: 59.8 million FCFA
Jun 19, 2023 C_BARE_BAKEM SIGNE 44.7 million FCFA 01/LC/C/BARE/SG/2023
Travaux de réhabilitation et extension de l`adduction d`eau potable (AEP de voisin)
Prestataire: ETS SCR ENGINEERING MULTIPLE
Jul 21, 2021 C_BARE_BAKEM SIGNE 15.1 million FCFA 004/LC/AONO/COMMUNE DE BARE/CIPM/2021
TRAVAUX DE REHABILITATION ET D`EXTENSION DE L`AEP DE PASSIM
Prestataire: ETS SCR ENGINEERING MULTIPLE

Top Authorities
Top Prestataires
Top Dates